Attention: Road closures in Thorney Village and the surrounding neighborhood


In the coming weeks, we have to be prepared for a roadworks and road closures in our village and the nearest area. Roadworks and traffic interruptions will be hindrance, especially for drivers. Therefore, Dear Residents before you are going to travel, check all the information and be prepared for obstacles. Remember! Be patient, do not rush, organize a travel plan and be careful.

Start on Monday, 4th December:

  • B1040 Crowland Road, Thorney - 04/12/17 for about one week

Date: 04 December — 08 December

Delays likely: Road closure

Works location: Crowland Road, Thorney

Works description: Carriageway resurfacing PB3024B

Responsibility for works: City of Peterborough

  • B1167 French Drove, Thorney - 04/12/17 for about three weeks

Date: 04 December — 22 December

Delays likely: Road closure

Works location: French Drove, Thorney

Works description: Carriageway construction PB3034B

Responsibility for works: City of Peterborough

  • A1139 Peterborough Road, Eye, Peterborough

Date: 04 December — 06 December

Delays likely: Traffic control (two-way signals)

Works description: Stoptap Replacements

Responsibility for works: Anglian Water

  • Peterborough Road, Crowland, Peterborough

04 December — 06 December

Delays possible: Traffic control (two-way signals)

Works location: 1053MTRS SOUTH OF JUNC HUNDREDS ROAD TO 1009MTRS SOUTH OF JUNC HUNDREDS ROAD ON, PETERBOROUGH ROAD

Works description: Build 1 precast chamber 725mm x 255mm x 665mm deep in Footway,Install 44m of 1 way poly duct in Verge

Responsibility for works: Openreach

  • B1166 Gravel Causeway, Crowland, Lincolnshire

Date: 04 December — 22 December

Delays likely: Road closure

Works location: Fen Bridge Gravel Causeway Crowland Lincolnshire

Works description: TSP - Structures Rewaterproof, crack inject x-heads and parapet plinth repair

Responsibility for works: Lincolnshire

  • Soke Road, Newborough, Peterborough

Date: 04 December — 15 December - 04/12/17 for about two weeks

Delays likely: Road closure

Works location: OUTSIDE 37 - JUNCTION OF ST MARTINS ROAD

Works description: Road Closure spoken to and agreed with Peterborough Council. Some works to take place at weekends to adhere to timescales

Responsibility for works: WESTERN POWER DISTRIBUTION (MIDLANDS)

  • St Martins Road, Newborough, Peterborough

Date: 04 December — 15 December

Delays likely: Road closure

Works location: OUTSIDE 33 - 73M FROM JUNCTION OF THORNEY ROAD

Works description: Road Closure agreed with Peterborough Council

Responsibility for works: WESTERN POWER DISTRIBUTION (MIDLANDS)

  • Luttongate, Gedney Hill, Lincolnshire

Date: 04 December — 06 December

Delays possible: Traffic control (multi-way signals)

Works description: to provide cable in existing duct

Responsibility for works: Openreach

  • Marshalls Bank, Parson Drove, Cambridgeshire

Date: 04 December — 04 December

Delays possible: Traffic control (two-way signals)

Works description: Carriageway patching

Responsibility for works: Cambridgeshire​

Source: roadworks.org

We remind to all people driving vehicles, as well as pedestrians, to exercise extreme caution on the roads, driving carefully and adherence to road signs.

Recommanded

Join our mailing list

Never miss an update

Search By Tags
No tags yet.
Follow "Thorney Village News"
  • Facebook Social Icon
  • Instagram Social Icon
  • Twitter Social Icon
  • Google+ Social Icon
  • LinkedIn Social Icon
bottom of page